March 9, 2020

Urunga Riverside Holiday Units

The final stage of holiday units was completed 2020. The construction included 8 new holiday units; two of which were required to be disabled access friendly, […]
December 30, 2020

Ergofix Physiotherapy Coffs Harbour

The refurbishment of the existing building at 122 West High Street, Coffs Harbour was completed in 2015. The refurbishment included; building extension to allow for five […]
December 31, 2020

Scotts Head Central

Scotts Head Central was completed in 2018. The construction included 2 new buildings (Block A and Block B) which could accommodate 7 retail/food or offices premises. […]
December 31, 2020

Club 300 Bowling & Bar

Completed in 2015, CBuild rebuilt the former ten pin bowling centre. The new design included; the new entrance with a lift, bowling lanes and entertaining area. […]
March 9, 2020

Urunga Riverside Holiday Units

The final stage of holiday units was completed 2020. The construction included 8 new holiday units; two of which were required to be disabled access friendly, […]
December 30, 2020

Ergofix Physiotherapy Coffs Harbour

The refurbishment of the existing building at 122 West High Street, Coffs Harbour was completed in 2015. The refurbishment included; building extension to allow for five […]
December 31, 2020

Scotts Head Central

Scotts Head Central was completed in 2018. The construction included 2 new buildings (Block A and Block B) which could accommodate 7 retail/food or offices premises. […]
December 31, 2020

Club 300 Bowling & Bar

Completed in 2015, CBuild rebuilt the former ten pin bowling centre. The new design included; the new entrance with a lift, bowling lanes and entertaining area. […]