The final stage of holiday units was completed 2020. The construction included 8 new holiday units; two of which were required to be disabled access friendly, […]
The refurbishment of the existing building at 122 West High Street, Coffs Harbour was completed in 2015. The refurbishment included; building extension to allow for five […]
Scotts Head Central was completed in 2018. The construction included 2 new buildings (Block A and Block B) which could accommodate 7 retail/food or offices premises. […]
Completed in 2015, CBuild rebuilt the former ten pin bowling centre. The new design included; the new entrance with a lift, bowling lanes and entertaining area. […]
The final stage of holiday units was completed 2020. The construction included 8 new holiday units; two of which were required to be disabled access friendly, […]
The refurbishment of the existing building at 122 West High Street, Coffs Harbour was completed in 2015. The refurbishment included; building extension to allow for five […]
Scotts Head Central was completed in 2018. The construction included 2 new buildings (Block A and Block B) which could accommodate 7 retail/food or offices premises. […]
Completed in 2015, CBuild rebuilt the former ten pin bowling centre. The new design included; the new entrance with a lift, bowling lanes and entertaining area. […]