Ergofix Physiotherapy Coffs Harbour
December 30, 2020Club 300 Bowling & Bar
December 31, 2020Scotts Head Central
Scotts Head Central was completed in 2018.
The construction included 2 new buildings (Block A and Block B) which could accommodate 7 retail/food or offices premises. The carpark contains 19 spaces which includes 2 disabled parking spaces; 1 each side of the buildings, a wheelchair accessible ramp is located at the front of Block B.
Scotts Head Pharmacy was able to still be operating out of a temporary building whilst construction was carried.